07.06.2007
We inform that the date of implementation of new orders is three months from date of order and make subscription.
07.06.2007
Thanks to a special making, the EKOMAT type stoves have been adapted to burn chipboard waste - in compliance with Journal of Laws No 1, Act of 22 December 2003, of Minister of Economy, Labour and Social Policy.
|
|
|
|
Boilers:
S-Ż coal-dust boiler
The coal-dust boilers are law-pressure heating installs made of steel which were designed for small boiler rooms in dwelling-houses, service workshops for individual customers, institutions etc. It’s main fuel is coal-dust. The S-Ż coal-dust boiler is equipped with a microprocessor controller and a blower. All the hatches are tightened with the heat-proof cord. The controller controlles the work of the blower. Thanks to this device the temperature of the water that feeds the central heating system is maintained on the same level. The air is being insuflatted under the grate and then throught the shout over the fuel as the secondary air. The most favorable assortment of the boiler to the objects being heated is guaranteed by the boiler’s wide range of power.
Technical and exploitation parameters:
| CALCULATE POWER (m2) |
1 |
1,5 |
2 |
2,5 |
3 |
3,5 |
4 |
5 |
| CALCULATE POWER (kW) |
12 |
18 |
24 |
30 |
36 |
42 |
48 |
60 |
| WIDTH (mm) |
410 |
500 |
520 |
600 |
6300 |
650 |
750 |
820 |
| HEIGHT (mm) |
1000 |
1190 |
1260 |
1260 |
1310 |
1360 |
1360 |
1450 |
| DEPTH (mm) |
500 |
500 |
550 |
550 |
600 |
650 |
700 |
750 |
| COOLER (m/h) |
280 |
| CONTROLER |
HURAGAN-FOSTER/ELEKTR. I |
| HEATING AREA (m2) |
100 |
140 |
180 |
220 |
250 |
300 |
350 |
450 |
| EFFICIENCY (%) |
78 |
78 |
78 |
78 |
78 |
78 |
78 |
78 |
| ENDING DZ | DP |
Dn40 |
| MAX. WATER PRESSURE(MPa) |
0,20 |
| TEMP OF SUPLY WATER (°C) |
100 |
| REQUIRED FUMES DRAUGHT (Pa) |
40 |
40 |
40 |
40 |
40 |
40 |
40 |
|
| MASS (kg) |
130 |
150 |
200 |
230 |
255 |
290 |
320 |
400 |
| DIAMETER OF CHIMNEY (mm) |
140 |
150 |
160 |
160 |
170 |
170 |
200 |
200 |
|
|